Projects / Hospitality

Humberside Airport Hilton Hotel All You Can Eat Buffet Refurbishment

A complete refurbishment of the hotel’s all-you-can-eat buffet, delivered while the hotel remained operational.

SectorHospitality
SettingOperational hotel
ScopeBuffet refurbishment

The brief

Refurbish the buffet. Keep the hotel running.

A live hospitality setting

Grade A was contracted to refurbish the all-you-can-eat buffet at the Humberside Airport hotel while the hotel continued to operate. The work needed to be kept separate from guests and hotel activity.

Temporary protection

Temporary hoarding was set up around the works to help contain dust and provide fire protection between the work area and the occupied hotel. This allowed the refurbishment to be organised around a live setting.

A complete new buffet

The scope went beyond a surface refresh. Grade A refurbished the area with new buffet furniture bespoke-manufactured in-house, new solid-surface worktops and integrated tops, tiling, painting and decorating, serving equipment and replacement flooring.

Scope of works

Made, fitted and finished as one project.

Bespoke manufacture, finishes and buffet equipment were brought together around the new serving layout.

01 / Manufacture

Made-to-measure furniture

New buffet furniture, counters and fitted units manufactured in-house and installed for the space.

02 / Worktops

Solid-surface detail

Solid-surface worktops created and integrated with the new buffet tops and serving units.

03 / Finishes

Walls and floor

Tiling, painting and decorating throughout the refurbished area, together with replacement flooring.

04 / Equipment

Food and drink service

New hobs and hot plates integrated into the buffet, alongside an open refrigerated unit for drinks service.

The result

A refreshed buffet for the hotel.

The refurbishment brought together new in-house-manufactured buffet furniture, solid-surface counters, tiled walls, updated hot-food and refrigerated service areas, decoration and replacement flooring. The completed photographs show the new layout ready for hotel use.

Discuss a hospitality refurbishment